Commercial Build Out Project in Tampa, FL by Hybrid Construction

Hybrid Construction was contracted to build-out a 1325 SF Frenchie’s Nail Salon near Armature Works and Downtown Tampa. Space was within the 1st floor of a 6 story residential condo building. It was newly constructed with no previous tenants.

Scope of work for the project included extensive slab trenching and cutting, plumbing and electrical rough-in and trim-out, concrete pours back, mechanical ductwork and ventilation ducting, fire sprinkler and fire alarm modifications, acoustical drop ceilings, metal wall framing, luxury vinyl tile flooring, furniture and cabinet assembly, and paint.

Close coordination between the Owners and Landlord was necessary to ensure existing overlapping scopes of work would come together properly. The duration of this project was approximately 90 days from start to completion.