<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>office building Archives - Hybrid Construction LLC</title>
	<atom:link href="https://www.hybridgc.com/tag/office-building/feed/" rel="self" type="application/rss+xml" />
	<link>/tag/office-building/</link>
	<description>Commercial and Residential Construction &#124; Professional General Contractor Tampa Bay</description>
	<lastBuildDate>Wed, 22 Mar 2017 13:50:14 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://www.hybridgc.com/wp-content/uploads/2015/02/hc-logo.png</url>
	<title>office building Archives - Hybrid Construction LLC</title>
	<link>/tag/office-building/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Tampa Port Materials Lab Construction Walk Thru/Sequence</title>
		<link>https://www.hybridgc.com/2017/03/21/tampa-port-materials-lab-construction-walk-thrusequence/</link>
		
		<dc:creator><![CDATA[owner]]></dc:creator>
		<pubDate>Tue, 21 Mar 2017 21:41:37 +0000</pubDate>
				<category><![CDATA[Construction]]></category>
		<category><![CDATA[Hybrid Construction]]></category>
		<category><![CDATA[Our Projects]]></category>
		<category><![CDATA[fascia]]></category>
		<category><![CDATA[HVAC system]]></category>
		<category><![CDATA[office building]]></category>
		<category><![CDATA[roof sheathing]]></category>
		<guid isPermaLink="false">https://www.hybridgc.com/?p=1006</guid>

					<description><![CDATA[<p>This article is intended to provide you with the perspective on the process to build a new commercial office building from the ground up in Tampa, FL.&#160; The project below was a material testing lab at the Port of Tampa.&#160; The smaller building made it easier to document the construction sequencing, so it was a &#8230; </p>
<p class="link-more"><a href="https://www.hybridgc.com/2017/03/21/tampa-port-materials-lab-construction-walk-thrusequence/" class="more-link">Continue reading<span class="screen-reader-text"> "Tampa Port Materials Lab Construction Walk Thru/Sequence"</span></a></p>
<p>The post <a href="https://www.hybridgc.com/2017/03/21/tampa-port-materials-lab-construction-walk-thrusequence/">Tampa Port Materials Lab Construction Walk Thru/Sequence</a> appeared first on <a href="https://www.hybridgc.com">Hybrid Construction LLC</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>This article is intended to provide you with the perspective on the process to build a new <a href="https://www.hybridgc.com/services/">commercial office building</a> from the ground up in Tampa, FL.&nbsp; The project below was a material testing lab at the Port of Tampa.&nbsp; The smaller building made it easier to document the construction sequencing, so it was a good choice for this article.&nbsp; The building size was roughly 625 SF and took approximately 3 months to complete.</p>
<p><img fetchpriority="high" decoding="async" class="aligncenter wp-image-1032 size-full" title="Materials Lab Construction of Tampa Port " src="https://www.hybridgc.com/wp-content/uploads/2017/03/1.jpg" alt="Tampa Port Materials Lab Construction Walk Thru/Sequence" width="469" height="352" srcset="https://www.hybridgc.com/wp-content/uploads/2017/03/1.jpg 469w, https://www.hybridgc.com/wp-content/uploads/2017/03/1-300x225.jpg 300w" sizes="(max-width: 469px) 100vw, 469px" /><img decoding="async" class="aligncenter wp-image-1033 size-full" title="Materials Lab Construction of Tampa Port " src="https://www.hybridgc.com/wp-content/uploads/2017/03/2.jpg" alt="Tampa Port Materials Lab Construction Walk Thru/Sequence" width="469" height="352" srcset="https://www.hybridgc.com/wp-content/uploads/2017/03/2.jpg 469w, https://www.hybridgc.com/wp-content/uploads/2017/03/2-300x225.jpg 300w" sizes="(max-width: 469px) 100vw, 469px" /></p>
<p>The site was fairly open with uneven gravel.&nbsp; Base materials were brought in and leveled for the site location.(Fortunately, this was an active material transport property, so plenty of materials were readily available from the Owner).&nbsp; <em>Note:&nbsp; It is very important to have an underground line detection service(such as Sunshine 811) scheduled for all sites prior to digging plumbing, electrical, or foundations</em>. <em>It is free and can help prevent costly mistakes.&nbsp;&nbsp; </em></p>
<p><img decoding="async" class="aligncenter size-full wp-image-1034" src="https://www.hybridgc.com/wp-content/uploads/2017/03/3.jpg" alt="Tampa Port Materials Lab Construction Walk Thru/Sequence" width="469" height="352" srcset="https://www.hybridgc.com/wp-content/uploads/2017/03/3.jpg 469w, https://www.hybridgc.com/wp-content/uploads/2017/03/3-300x225.jpg 300w" sizes="(max-width: 469px) 100vw, 469px" /><img loading="lazy" decoding="async" class="aligncenter size-full wp-image-1035" src="https://www.hybridgc.com/wp-content/uploads/2017/03/4.jpg" alt="Tampa Port Materials Lab Construction Walk Thru/Sequence" width="469" height="352" srcset="https://www.hybridgc.com/wp-content/uploads/2017/03/4.jpg 469w, https://www.hybridgc.com/wp-content/uploads/2017/03/4-300x225.jpg 300w" sizes="auto, (max-width: 469px) 100vw, 469px" /></p>
<p>Once the pad is ready, we began forming the slab and foundation.&nbsp; This project was designed with a thickened slab edge, which means the slab and foundation were integrated and can be poured at the same time.&nbsp; The wood forms were set and prepped for the plumber to start work.&nbsp; We roughed in all the underground plumbing (right photo) per the project plans with coordination from the site dimensions provided by the formwork.&nbsp; A county inspection occurred at this point for the underground plumbing.</p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-1039" title="Materials Lab Construction of Tampa Port " src="https://www.hybridgc.com/wp-content/uploads/2017/03/5.jpg" alt="Tampa Port Materials Lab Construction Walk Thru/Sequence" width="450" height="338" srcset="https://www.hybridgc.com/wp-content/uploads/2017/03/5.jpg 469w, https://www.hybridgc.com/wp-content/uploads/2017/03/5-300x225.jpg 300w" sizes="auto, (max-width: 450px) 100vw, 450px" /></p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-1041" title="Tampa Port Materials Lab Construction Walk Thru/Sequence" src="https://www.hybridgc.com/wp-content/uploads/2017/03/6.jpg" alt="Tampa Port Materials Lab Construction Walk Thru/Sequence" width="450" height="338" srcset="https://www.hybridgc.com/wp-content/uploads/2017/03/6.jpg 469w, https://www.hybridgc.com/wp-content/uploads/2017/03/6-300x225.jpg 300w" sizes="auto, (max-width: 450px) 100vw, 450px" /></p>
<p>Following inspection approval, the slab was further prepped with plastic, welded wire mesh, and rebar.&nbsp; Another inspection from the county was performed for the slab prep prior to the concrete pour.&nbsp; Once approved, the slab and footings were poured and finished (right photo).</p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-1042" title="Materials Lab Construction of Tampa Port" src="https://www.hybridgc.com/wp-content/uploads/2017/03/7.jpg" alt="Tampa Port Materials Lab Construction Walk Thru/Sequence" width="450" height="338" srcset="https://www.hybridgc.com/wp-content/uploads/2017/03/7.jpg 469w, https://www.hybridgc.com/wp-content/uploads/2017/03/7-300x225.jpg 300w" sizes="auto, (max-width: 450px) 100vw, 450px" /></p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-1043" title="Materials Lab Construction of Tampa Port " src="https://www.hybridgc.com/wp-content/uploads/2017/03/8.jpg" alt="Tampa Port Materials Lab Construction Walk Thru/Sequence" width="450" height="338" srcset="https://www.hybridgc.com/wp-content/uploads/2017/03/8.jpg 469w, https://www.hybridgc.com/wp-content/uploads/2017/03/8-300x225.jpg 300w" sizes="auto, (max-width: 450px) 100vw, 450px" /></p>
<p>After a concrete cure period of a few days, the CMU block work for the exterior walls was brought in and installed on top of the floor slab.&nbsp; Additional inspections were performed prior to pouring the top beam and block cells. (You can see the knockouts at the base of the interior walls to ensure concrete makes it all the way down to the slab.)</p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-1044" title="Materials Lab Construction of Tampa Port " src="https://www.hybridgc.com/wp-content/uploads/2017/03/9.jpg" alt="Tampa Port Materials Lab Construction Walk Thru/Sequence" width="450" height="338" srcset="https://www.hybridgc.com/wp-content/uploads/2017/03/9.jpg 469w, https://www.hybridgc.com/wp-content/uploads/2017/03/9-300x225.jpg 300w" sizes="auto, (max-width: 450px) 100vw, 450px" /></p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-1045" title="Materials Lab Construction of Tampa Port " src="https://www.hybridgc.com/wp-content/uploads/2017/03/10.jpg" alt="Tampa Port Materials Lab Construction Walk Thru/Sequence" width="450" height="338" srcset="https://www.hybridgc.com/wp-content/uploads/2017/03/10.jpg 469w, https://www.hybridgc.com/wp-content/uploads/2017/03/10-300x225.jpg 300w" sizes="auto, (max-width: 450px) 100vw, 450px" /></p>
<p>Prefabricated roof trusses were built off site and delivered with the plywood sheathing.&nbsp; Each truss was installed and secured to the top wall beam using embedded straps.&nbsp; Once all trusses were secure, the roof sheathing, fascia, and soffit were installed.&nbsp;</p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-1046" title="Materials Lab Construction of Tampa Port" src="https://www.hybridgc.com/wp-content/uploads/2017/03/11.jpg" alt="Tampa Port Materials Lab Construction Walk Thru/Sequence" width="450" height="338" srcset="https://www.hybridgc.com/wp-content/uploads/2017/03/11.jpg 469w, https://www.hybridgc.com/wp-content/uploads/2017/03/11-300x225.jpg 300w" sizes="auto, (max-width: 450px) 100vw, 450px" /></p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-1048" title="Materials Lab Construction of Tampa Port " src="https://www.hybridgc.com/wp-content/uploads/2017/03/13.jpg" alt="Tampa Port Materials Lab Construction Walk Thru/Sequence" width="450" height="600" srcset="https://www.hybridgc.com/wp-content/uploads/2017/03/13.jpg 352w, https://www.hybridgc.com/wp-content/uploads/2017/03/13-225x300.jpg 225w" sizes="auto, (max-width: 450px) 100vw, 450px" /></p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-1049" title="Materials Lab Construction of Tampa Port " src="https://www.hybridgc.com/wp-content/uploads/2017/03/14.jpg" alt="Tampa Port Materials Lab Construction Walk Thru/Sequence" width="450" height="600" srcset="https://www.hybridgc.com/wp-content/uploads/2017/03/14.jpg 352w, https://www.hybridgc.com/wp-content/uploads/2017/03/14-225x300.jpg 225w" sizes="auto, (max-width: 450px) 100vw, 450px" /></p>
<p>The final phase of the project is considered the trim-out of all remaining scope items.&nbsp; The cabinetry and countertops are delivered and installed.&nbsp; All MEP items are trimmed out and tested including, bathroom plumbing fixtures, electrical devices, lighting, and the <a target="_blank" href="https://en.wikipedia.org/wiki/HVAC" rel="external nofollow">HVAC system</a> components.&nbsp; During this phase of the project, all final inspections are scheduled with the county including a plumbing final, electrical final, mechanical final, and building final.&nbsp; Once approvals are obtained, the county provided a certificate of occupancy to confirm the project is completed.&nbsp; The building was cleaned inside and out and turned over to the Owner.&nbsp;</p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-1047" title="Materials Lab Construction of Tampa Port" src="https://www.hybridgc.com/wp-content/uploads/2017/03/12.jpg" alt="Tampa Port Materials Lab Construction Walk Thru/Sequence" width="450" height="338" srcset="https://www.hybridgc.com/wp-content/uploads/2017/03/12.jpg 469w, https://www.hybridgc.com/wp-content/uploads/2017/03/12-300x225.jpg 300w" sizes="auto, (max-width: 450px) 100vw, 450px" /></p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-1052" title="Materials Lab Construction of Tampa Port " src="https://www.hybridgc.com/wp-content/uploads/2017/03/16-1.jpg" alt="Tampa Port Materials Lab Construction Walk Thru/Sequence" width="450" height="338" srcset="https://www.hybridgc.com/wp-content/uploads/2017/03/16-1.jpg 469w, https://www.hybridgc.com/wp-content/uploads/2017/03/16-1-300x225.jpg 300w" sizes="auto, (max-width: 450px) 100vw, 450px" /></p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-1053" title="Materials Lab Construction of Tampa Port " src="https://www.hybridgc.com/wp-content/uploads/2017/03/17.jpg" alt="Tampa Port Materials Lab Construction Walk Thru/Sequence" width="450" height="338" srcset="https://www.hybridgc.com/wp-content/uploads/2017/03/17.jpg 469w, https://www.hybridgc.com/wp-content/uploads/2017/03/17-300x225.jpg 300w" sizes="auto, (max-width: 450px) 100vw, 450px" /></p>
<p>While residential and commercial projects can be very different, many of the core principles and building techniques are similar for many projects.&nbsp; Whether we are building a house or an office building, the process and sequencing follow a familiar path.&nbsp;&nbsp; From a concrete slab and CMU blockwork to mechanical/electrical/plumbing rough-in and trim-out, even a small project like the one presented above can provide a solid knowledge base of what it takes to construct a new building.</p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-1054" title="Materials Lab Construction of Tampa Port " src="https://www.hybridgc.com/wp-content/uploads/2017/03/18.jpg" alt="Tampa Port Materials Lab Construction Walk Thru/Sequence" width="450" height="338" srcset="https://www.hybridgc.com/wp-content/uploads/2017/03/18.jpg 469w, https://www.hybridgc.com/wp-content/uploads/2017/03/18-300x225.jpg 300w" sizes="auto, (max-width: 450px) 100vw, 450px" /></p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-1050" title="Materials Lab Construction of Tampa Port " src="https://www.hybridgc.com/wp-content/uploads/2017/03/15.jpg" alt="Tampa Port Materials Lab Construction Walk Thru/Sequence" width="450" height="338" srcset="https://www.hybridgc.com/wp-content/uploads/2017/03/15.jpg 469w, https://www.hybridgc.com/wp-content/uploads/2017/03/15-300x225.jpg 300w" sizes="auto, (max-width: 450px) 100vw, 450px" /></p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-1055" title="Materials Lab Construction of Tampa Port " src="https://www.hybridgc.com/wp-content/uploads/2017/03/19.jpg" alt="Tampa Port Materials Lab Construction Walk Thru/Sequence" width="338" height="450" srcset="https://www.hybridgc.com/wp-content/uploads/2017/03/19.jpg 352w, https://www.hybridgc.com/wp-content/uploads/2017/03/19-225x300.jpg 225w" sizes="auto, (max-width: 338px) 100vw, 338px" /></p>
<p><a href="https://www.hybridgc.com">Hybrid Construction LLC</a> is a General Contractor located in Tampa, FL.&nbsp; We specialize in residential and commercial remodeling through Hillsborough, Pinellas, and Pasco Counties.&nbsp;</p>
<p>The post <a href="https://www.hybridgc.com/2017/03/21/tampa-port-materials-lab-construction-walk-thrusequence/">Tampa Port Materials Lab Construction Walk Thru/Sequence</a> appeared first on <a href="https://www.hybridgc.com">Hybrid Construction LLC</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
