Hybrid Construction was contracted to perform a Cafe remodel at a local Barnes and Noble bookstore.
The work included full demo of kitchen, wall paper removal, railing demo, ceiling tile demo, and drywall removal. The upgrades included new cabinetry and countertops, wallpaper and paint, plumbing/electrical relocations underground and trim-out, floor patch and tile repairs, and new ceiling tiles.
The duration of this project was 7 days and included nights and long hours to get it accomplished. In addition, the project required permit and inspections.
Pre-planning for the project weeks ahead of the start date was critical to schedule success.
BEFORE
AFTER