Tune Up, The Manly Salon Buildup Project

Hybrid Construction was contracted to build out Tune-Up, the Manly Salon, a barbershop salon in South Tampa off Kennedy Blvd. The Scope of work for the project included extensive slab trenching and cutting, plumbing and electrical rough-in and trim-out, concrete pour back, new mechanical ductwork and drum diffuser, flake epoxy floors, wall framing, and POS/Bar …

Build-Out Project In Westchase, FL For Eagle Eye Vision

blank

Hybrid Construction was contracted to build-out a 2100 SF Eye Doctor Office for Eagle Eye Vision in Westchase. The space was an existing bar/restaurant and required extensive demolition. Scope of work for the project included extensive slab trenching and cutting for room layout, plumbing and electrical rough-in/trim-out, concrete pour back, Wall framing and drywall including …