FHA 203K Bank Loan Rehab Remodeling in Tampa FL

FHA 203K Bank Loan Rehab Remodeling in Tampa FL

Carrollwood 203K Remodel: Project Description: 2,800 SF full house interior remodel.  FHA 203K Bank loan rehab.  The scope of work includes floor plan layout changes, bathroom remodels, kitchen remodel, skylight additions, interior and exterior door replacements, and other finish work.  Budget for this project is around $100,000 Cutting in new French door opening for lake …

Odessa Brewery Build-Out Project Progress (by Hybrid Construction LLC)

Progress Article – Odessa Brewery Build-Out

Project Description: 1,200 SF brewery remodel in a 1960’s retail building.  The scope of work includes framing/drywall for layout, bathroom additions, bar area plumbing, hollow metal frames and solid core doors, spiral ductwork, and other finish work.  Budget for this project is around $50,000 Front to rear space photo.  Trenching and plumbing rough-ins were completed …

Tampa Northdale Daycare Office Remodel

Project Article – Northdale Daycare Office Remodel

Project Description: This renovation project was located in the Northdale/Carrollwood area of Tampa and involved and existing office space of approximately 5,000 SQ FT.  Space was remodeled into a Child Daycare Academy.  The project required a lengthy permit review and inspection process with the County, but the actual construction took about 4 months to complete.  …

Investor Rehab – Home Renovation Project

Investor Rehab - Home Renovation Project

Project Description: Single Family Home approximately 1500 SQ FT.  2 Bedroom/2 Bathroom built in 1959 with great curb appeal.  Property was purchased by an investor to flip. Scope of Work: Convert odd shaped dining room into a 3rd bedroom Repair termite damage in Florida room and drywall ceiling and walls Complete gut of kitchen. Replace …

Tampa Port Materials Lab Construction Walk Thru/Sequence

Tampa Port Materials Lab Construction Walk Thru/Sequence

This article is intended to provide you with the perspective on the process to build a new commercial office building from the ground up in Tampa, FL.  The project below was a material testing lab at the Port of Tampa.  The smaller building made it easier to document the construction sequencing, so it was a …

Hybrid Construction Completes Project at International Plaza Mall in Tampa

blank

This project was done at International Plaza Mall in Tampa.  Space was on the 2nd floor of the mall, centrally located.  The first phase of the project consisted of demolition of the existing cabinetry, plaster walls, and flooring.  The construction phase of the project consisted of framing and drywall of a new dressing room and …

Quick Contractor Pricing

blank

As a General Contractor, performing and pricing projects of various types exposes us to all kinds of situations and challenges.  With that experience and exposure, we come to realize that every project is unique and typically requires specific pricing that cannot fit a one-size-fits-all strategy. However, the majority of projects, both Residential and Commercial, have …