Tune Up, The Manly Salon Buildup Project

Hybrid Construction was contracted to build out Tune-Up, the Manly Salon, a barbershop salon in South Tampa off Kennedy Blvd. The Scope of work for the project included extensive slab trenching and cutting, plumbing and electrical rough-in and trim-out, concrete pour back, new mechanical ductwork and drum diffuser, flake epoxy floors, wall framing, and POS/Bar framing, fire sprinkler modifications, and a gas water heater system. Close coordination with the Owner was required to time the FFE install and maintain the schedule. The duration of this project was approximately 80 days from start to completion.